| STEP BY STEP LEAKING SHOWER REPAIR PROCEDURE |
|
|
Re-lining the wall surfaces ready for tiling
|
|
|
 |
|
|
|
Drawn by David Viles (not to scale - guide only) |
|
|
The wall linings are installed over the APRIL PVC SHOWER TRAY and made ready for the application of the new wall
tiles.
Mix a combination of PVC primer and a cementitious tile adhesive. This forms a paste which is applied over the wall edge of the shower tray against the brickwork. This paste when cured will aid in the adhesion of the new cement render
to the shower tray.
A caulking gun is used to apply a bead of fast cure poly-urethane sealant between the intersection of the old and new fibre cement wall sheets.
Seal the vertical intersection joint between the cement render and fibre
cement wall lining.
Apply a waterproof sealer over the cement render. This forms a barrier, stopping moisture from entering the brick walls. |
|
|
|
 |
|
 |
|