 |  |  |  |  |
|
STEP BY STEP LEAKING SHOWER REPAIR PROCEDURE |
|
|
Installing the brick hob and tiling strips
|
|
|
 |
|
|
|
Drawn by David Viles (not to scale - guide only) |
|
|
The bricks are adhered inside the APRIL PVC SHOWER TRAY. The fibre cement sheet, used as a tiling strip, is bonded to the outside of
the shower tray.
Use common house bricks to form the hob edge, leaving gaps at the ends for a water passage to the base of the shower tray.
Use a caulking gun to apply a bead of fast cure poly-urethane to secure the bricks and tiling
strips in place.
|
|
|
EVERY COMPONENT THAT IS SATURATED BY WATER IS BUILT WITHIN THE AREA OF THE APRIL SHOWERS "MADE TO MEASURE" PVC TRAY. |
|
|
|
 |
|
 |
|