| STEP BY STEP LEAKING SHOWER REPAIR PROCEDURE |
|
Re-tiling the shower area
|
|
|
 |
|
|
|
Drawn by David Viles (not to scale - guide only) |
|
|
Use a good quality wall tile adhesive to re-tile the wall edges.
The tile adhesive we recommend on the hob tiles is a
cementitious based tile adhesive.
Tile grout used is a flexible pre-mixed and water resistant.
All floor tiles are wet bedded on a mortar tile bed which consists of a 4:1 Sand and Cement mix.
The grout used on the floor tiles is
mixed with off white cement and sand.
Use a grout rake to remove the grout from the vertical internal corner of the shower area. Use a caulking gun to apply a bead of flexible anti-mould silicone down this internal corner.
|
|
|
| THERE IS A WAITING PERIOD OF 4 DAYS BEFORE THE SHOWER SCREEN CAN BERE-INSTALLED. IN THIS TIME THE ADHESIVES, GROUTS AND MORTAR CAN
CURE. |
|
|
|
 |
|
 |
|