STEP BY STEP LEAKING SHOWER REPAIR PROCEDURE
Installing the shower screen
Drawn by David Viles (not to scale - guide only)
Re-drill and plug the wall tiles to accommodate the shower screen frame
to the new fixing position.

Use stainless steel screws to fix the frame sections to the wall.

Rivet the shower screen sections together where required, the old holes
for the rivets may need re-drilling to line up.

Use a caulking gun to apply a bead of flexible anti-mould silicone around the outside sections of the shower screen/tile intersections.

Apply a silicone seal behind the tap flanges on the wall.

THERE IS A WAITING PERIOD OF 2 DAYS BEFORE YOU CAN USE
YOUR NEWLY REPAIRED SHOWER.

HINT
To keep your grout joints looking clean and mould free, use normal household
laundry bleach. Once a month apply the bleach on and let it stand for 24 hours. Just rinse the area the next day.
Back


   More Leaking Shower Repairs

  • Leaking shower repairs - Preliminary evaluation - Page 1
  • Leaking shower repairs - Shower screen removal - Page 2
  • Leaking shower repairs - Removal of floor tiles and mortar bed - Page 3
  • Leaking shower repairs - Removal of tiles and brickwork forming the hob - Page 4
  • Leaking shower repairs - Partial removal of wall tiles and wall lining - Page 5
  • Leaking shower repairs - Installation of the April Shower tray - Page 6
  • Leaking shower repairs - Re-lining of the wall surfaces ready for tiling - Page 7
  • Leaking shower repairs - Installing the brick hob and tiling strips - Page 8
  • Leaking shower repairs - Re-tiling the shower area - Page 9
  • Leaking shower repairs - Installing the shower screen - Page 10






    Home PageTable Of ContentsE-Mail



    Last Update: 04/05/01 - Copyright ©1999 by April Showers Waterproofing - ALL RIGHTS RESERVED